Day checklist

Day checklist is a Timeline block from Orvain UI, built for React and Vue with a matching Figma frame.

Best for

A day of work: what happened when, what is still open, and who did it

Anatomy

Month and done count over the day's title with a progress ring · dashed time chips on a dashed rail · entries that open with a face, name and role · tasks with a flat brand check and the title struck through, a dark due pill for the soonest, a ring that opens subtasks, the assignee and a ⋯ menu · a write-up folded after two paragraphs with its attachment

MCPConnect the MCP server
November 2026 · 0 of 4 done

Friday, 6

10:30 AM
Mia ChenDesign

Token audit before the release

Ran the audit before the release. Every surface, border and content value resolves from one place now; the three that did not are in the write-up below.

12:30 PM

Release prep, four tasks

  • Finish the token audit
    2 daysDone
    List every hex literal
    Map exact matches to tokens
    Pick the nearest value for the rest
    Re-run the contrast checks
    Assigned to Mia Chen
  • Walk design through the scale
    3:00 PM · 30 minDone
    Assigned to Leo Ortiz
  • Hand the report to release
    TomorrowDone
    Export the audit as a PDF
    Post it in the release thread
    Assigned to Noah Park
  • Finalize everything else
    TodayDone
    Changelog
    Screenshots
    Version bump
    Assigned to Ava Reid
1:30 PM
Noah ParkEng

What the audit changed

Three values were still written as hex in the block files rather than read from the tokens, so a change to the palette moved most of the system and left those three behind.

Two were exact matches for a token that already existed, which made them a rename with no visual change at all. The third was four points lighter than anything in the scale.

That one goes to the secondary content value, the nearest thing the scale holds. It reads a shade darker on a subtle surface, and it passes at twelve point where the old one did not.

The audit is attached. Nothing in it moves a resting measurement, so the pages that already sign off stay signed off.

token-audit.pdf84 KB

In the Orvain Library

Get Day checklist for your product

The block’s code in React and Vue, its frame in the Figma file, and the Orvain MCP so your AI tools build with it. Part of every Library plan, alongside every other block.

  • React
  • Vue
  • Figma frame
  • Orvain MCP

About this block

Part of Timeline

What’s inside

05parts

The pieces it is built from. Keep them all, or drop the ones your product doesn’t need.

  1. Month and done countover the day's title with a progress ring
  2. Dashed time chipson a dashed rail
  3. Entries that openwith a face, name and role
  4. Tasks with a flat brand check and the title struck through, a dark due pill for the soonest, a ring that opens subtasks, the assignee and a ⋯ menu
  5. A write-up folded after two paragraphs with its attachment

Responsive behaviour

560 px

Drawn at this width and never stretched past it. Below it, controls, text and spacing step down from the box the block sits in, not the window.

1440pxDesktop · 12 columns

When to use it

Where Timeline earns its place

Reach for Timeline

  • An audit trail, where the question is who did what and when.
  • A discussion whose replies only make sense beside the text they quote.
  • A day view of work, mixing what has been done with what is still open.
  • Feeds where automated events sit among human ones and the difference has to be visible.

Reach for something else

  • A list of things still to do. Those sort by priority and owner rather than by time, which makes them a task list.
  • Machine logs at volume. A virtualised table with columns and filters beats a rail you have to scroll.
  • Work with durations and overlap. A rail shows order only; a calendar or a Gantt chart shows length and collision.

Accessibility

06to keep

What the block ships with. Hold on to these as you make it yours.

  • Named controlsEvery icon-only button keeps a text label, so a screen reader can say what it does.
  • Keyboard firstEvery control is reachable with Tab, and its focus ring stays visible.
  • More than colourA state never rides on colour alone; a mark or a word goes with it.
  • Contrast holdsRetheme freely, but keep text at or above the contrast it ships with.
  • Calm motionFor visitors who ask for reduced motion, things simply appear.
  • Room to hitTargets stay at least 24px, with space between neighbours.

Notes for AI

1 line

Is all your assistant needs. With the Orvain MCP connected, it builds the block from your own tokens and components.

Add the Orvain “Day checklist” block to this page: month and done count over the day's title with a progress ring, dashed time chips on a dashed rail, entries that open with a face, name and role, tasks with a flat brand check and the title struck through, a dark due pill for the soonest, a ring that opens subtasks, the assignee and a ⋯ menu, a write-up folded after two paragraphs with its attachment.

Works in
Connect the MCP

Questions about Day checklist.

What is the Day checklist block?

Day checklist is a Timeline block from Orvain UI, built for React and Vue with a matching Figma frame. Best for a day of work: what happened when, what is still open, and who did it.

What is the Day checklist block made of?

Is the Day checklist block responsive?

Is the Day checklist block accessible?

How do I add the Day checklist block to my project?

When should I not use a Timeline block?

More Timeline blocks

All Timeline

Day so far

A live day: what has happened up to now and what is still planned

Day by slot

A long day to scroll: the time you are reading stays pinned

Date and mention

Thread history: the day it happened and who was pulled in

File and call

Audit trails: the upload and the booking, each with its actor

Task and reaction

Team activity: assignments, reactions and the system's own notices

Attachment events

File history: an event plus the documents it produced, each one ticked off as reviewed

Delivery tracker

Orders, shipments and any process with done, current and upcoming steps

Delivery ETA

Tracking pages where the first question is how long until it arrives

Delivery day

Same-day deliveries and any journey where the time between steps matters

The Orvain Dispatch

Premium components, free in your inbox.

Join the Orvain Dispatch and get production-ready components, free to keep: React and Vue code plus the Figma frame, yours to ship.

Just components, never spam. You can unsubscribe anytime.